- Use one fixed one-page layout so evaluators can compare projects side by side.
- Print only numbers you can trace to a document and the client has approved for this use.
- Anonymise identifiers, never facts: dates, scope and your role stay precise.
- Collect written consent during the project, not when the tender notice arrives.
A bid team usually has one good case study and sends it everywhere. It tells the story of a hard project, praises the team and closes with a photograph. A procurement reader looking at a supplier file wants something else: what was delivered, for whom, at what scale, when, and who can confirm it. If those answers are buried in prose, the case study does not count as evidence.
This guide sets out a one-page format built for that reader, with rules for the numbers you may print and a way to handle clients who will not let you use their name.
What the reader is actually checking
Evaluators compare suppliers against a list fixed in advance. They are not hunting for the best story. They are looking for matches: similar work, similar size, recent, completed properly, and confirmable.
The experience statement in one Saudi government entity’s prequalification questionnaire shows how specific this gets. In the EXPRO Prequalification of Tenderers Procedure, companies are asked, where the cover letter says so, to provide only experience in work similar in type and magnitude to the scope, to say whether all awarded contracts were satisfactorily completed, and to list current contracts and those completed in the last three years. For each, the table asks for the customer’s name, address and representative, a description of the work (including whether the company was prime contractor or subcontractor), the value, start and end dates and schedule status. For past government work it asks for the ministry and contract number. (The form’s notes also mention over, on or under budget, but its table has no budget column, so check the current form before copying it.)
That is one entity’s form, not a rule for every buyer, but the pattern is common: structured fields, comparable projects, named contacts. A narrative case study that does not carry the same fields forces the evaluator to dig for them, and an evaluator working through many submissions may not find them.
Buyers also trust what others say about you more than what you say. Gartner’s 2023 survey of 771 B2B buyers (fielded November and December 2022) found they value third-party interactions 1.4x more than digital supplier interactions. The release gives customer references, reviews and expert consultations as examples of third-party sources and does not isolate references, so treat the figure as direction, not a measure of references alone. It does support one design choice: put the client’s confirmation inside the case study, not around it. Source: Gartner press release, 8 June 2023.
The one-page format
Keep each case study to one page in the same layout, so evaluators can compare projects side by side. Use a fact strip at the top, then four short blocks.
| Block | What it contains | What to leave out |
|---|---|---|
| Fact strip | Client (or anonymised descriptor), country and city, sector, your role (main contractor, subcontractor, supplier, consultant), contract type, start and completion dates, status | Adjectives. Every field is a fact or it is blank |
| Problem and conditions | What the client needed and what made it difficult: site access, deadline, standards, live operations, regulator or consultant requirements | Generic claims such as “complex project” |
| Scope delivered | What you did, in the vocabulary of the tender: systems, quantities, disciplines, approvals obtained, who you coordinated with | Scope you only managed through a sub-supplier, unless labelled as such |
| Proof | Client-approved numbers, completion or handover document reference, certificates, quality or safety records tied to this project | Estimated figures, rounded-up figures, anything you cannot trace to a document |
| Client confirmation | A named contact willing to be called, or a signed reference letter, or the reason it is withheld and what you offer instead | Invented-sounding praise with no name behind it |
The fact strip does most of the work. If a reader can place the project against the tender’s “similar works” requirement in ten seconds, the rest of the page becomes supporting detail.
Write the problem and scope in the tender’s own terms
The same project can be described three ways. A business development director might write “delivered a state-of-the-art system for a prestigious client”. A project manager might write “installed 40 units”. An evaluator needs “supply, installation, testing and commissioning of the systems in a live commercial building, completed with the building occupied, handed over with consultant approval”.
Take the vocabulary from the tender documents you are targeting, and keep a shorter version for each type of buyer. This is the same logic as the structure of a bid profile: order the information the way the score sheet does. Our guide to the company profile for pre-qualification covers that layer, and the technical proposal guide covers the next one.
Two habits improve the problem block quickly:
- State the constraint, not the effort. “Works restricted to night shifts under the operator’s access rules” tells the reader more than “our team worked tirelessly”.
- Separate what the client asked for from what you decided. Evaluators score compliance with the brief. Your own improvements belong in one line, labelled as such.
Numbers: print only what the client has approved
Numbers carry the weight of a case study, and they are where companies take the most risk. A figure that cannot be traced will not survive a reference call, and a figure that reveals the client’s confidential commercial position can damage the relationship.
Apply these rules to every figure before it goes on a page:
- Source it. Each number maps to a document: contract, variation order, handover certificate, test report, or client email. Keep the reference in your internal file even if you do not print it.
- Use the definition the document uses. If the contract value excludes variations, say so. Do not mix contract value with final account value.
- Get the number approved in writing, not just the project. Permission to name a client is not permission to publish its contract value, headcount on site or savings achieved.
- Prefer ranges or bands when the client wants discretion. “Contract value within a stated band” or “over 20,000 square metres of fitted area” can be accurate and acceptable at once. Say how the band was chosen.
- Do not round in your favour. If the project finished on time after an approved extension, say “completed within the extended programme”. Evaluators check dates against references.
- Drop the number when you have nothing to anchor it. No figure is better than a figure nobody can confirm.
When the client will not be named
Some clients, particularly in contracting, manufacturing and security, will not allow their name on a supplier’s document. Common reasons are confidentiality clauses, site security and internal policy. Do not drop the project. Choose a disclosure level and say which one you are using.
| Level | What you print | What you offer |
|---|---|---|
| 1. Named | Client name, project, full fact strip, approved numbers | Contact for a reference call |
| 2. Named, limited detail | Client and project named; numbers shown as bands or omitted | Reference call with approved topics |
| 3. Anonymised | Descriptor such as “government health facility, Eastern Province”, real dates and scope | Name disclosed under NDA to the evaluator during clarification |
| 4. On request | One line in a project list: sector, country, year, your role | Full case study released only with the client’s consent for that tender |
Anonymising a case study means removing identifiers, not removing facts. A reader who cannot name the client can still weigh the scope, the dates and the constraints. What they cannot weigh is vagueness, so keep dates, quantities and your role precise even when the name is hidden.
Client consent: what to ask for and when
Ask for consent while the project is still going well, not when the tender notice arrives. A short written consent form, signed by someone with authority at the client, avoids most disputes later. It should cover:
- Whether the client name and logo may be used, and in which materials (bid documents, website, presentations, social media).
- Which facts and numbers are approved, listed one by one.
- Whether photographs and video of the site may be used, and any site-security restrictions.
- Whether a named person may be listed as a reference, and the best channel to reach them.
- Whether quotes from individuals may be used. A named person’s quote, title or photograph can count as personal data under data-protection laws such as the Saudi Personal Data Protection Law, so ask for the individual’s consent as well as the company’s. This is general information, not legal advice: the law and its regulations change, so check the current text and take legal advice on your own contracts and the rules that apply to them.
- An expiry or review date, so the permission is checked again rather than assumed forever.
Check your own contract first. Some supply and subcontract agreements restrict publicity or require the main contractor’s approval before you refer to a project. A consent from the end client may not be enough if you worked as a subcontractor.
A worked example (hypothetical)
The following is an invented illustration, not a real project, client or data. Take a mechanical contractor that completed a ventilation upgrade in an occupied office tower. The first draft read: “A landmark project delivered to the highest standards for a leading developer.”
The rewritten fact strip reads: client anonymised as “private developer, commercial tower, Riyadh”; role subcontractor to the main contractor; scope: supply, installation, testing and commissioning of air-handling equipment on 12 floors; works in night shifts under building-management access rules; completed after a client-approved extension to the original date; handover certificate dated and filed.
In this illustration the company adds a client contact available on request, and a number band that the client approved. The page is shorter and less impressive on first read, and far more useful to someone scoring it. It also survives a reference call, because every line can be confirmed.
Build the library, then check each page
One strong case study is a start. A bid team needs a small library: five to eight projects in the format above, tagged by sector, service and country, each with its consent status and expiry date. Then each tender takes two or three of them, chosen to match the requirement.
Before any case study leaves the building, check:
- Every figure traces to a document and was approved for this use.
- Dates and your role match the contract and the reference the client would give.
- The disclosure level is stated and consistent across the bid, the website and the presentation.
- Terms, such as “similar works”, match the tender’s wording.
- Arabic and English versions state the same facts. See bilingual company profile formats for how to manage two editions.
- Photographs show your work, not a stock project, and carry site and client permission.
Turning real project records into standard bid pages is a sales enablement job as much as a design one. RX works on this kind of material as part of its business solutions and sales enablement service. RX’s own Azeidk case study shows how the scope of a long engagement can be presented publicly without publishing client campaign figures. If you would rather have someone review your current bid evidence and decide what to fix first, that is what a business diagnosis session is for.
Frequently asked questions
How long should a B2B case study for procurement be?
One page in a fixed layout is usually enough: a fact strip, the problem and conditions, the scope you delivered, proof with approved numbers, and a client confirmation. Evaluators compare many suppliers, so a consistent short format is easier to score than a long narrative.
Can we use a case study if the client will not let us name them?
Yes. Anonymise the identifiers, not the facts. Keep dates, scope, quantities and your role precise, state that the client is anonymised, and offer to disclose the name to the evaluator under NDA or with the client's consent for that tender.
What numbers are safe to include?
Only numbers you can trace to a document and that the client has approved for this use. Where the client wants discretion, use a stated band instead of an exact figure. Never include estimates or rounded-up figures, and never publish a client's advertising or campaign results without approval of those exact figures.
Do we need written consent for a case study?
It is the safe course. A signed consent covering name and logo use, approved facts and numbers, photographs, named references and individual quotes avoids later disputes. Also check your own contract, because some agreements restrict publicity or need the main contractor's approval. Take legal advice for your specific agreements.
How many case studies does a bid library need?
There is no fixed number. Five to eight projects, each tagged by sector, service and country with its consent status and review date, lets a bid team select the two or three that best match each tender.
- Expro (Saudi Arabia), Prequalification of Tenderers Procedure (EPM-KD0-PR-000003).
- Gartner, Gartner Marketing Survey Finds B2B Buyers Value Third-Party Interactions More Than Digital Supplier Interactions (2023-06-08).
- SDAIA, Personal Data Protection Law (PDPL) overview.